Modern Air Mechanical
modernair.biz

El Capitan High School

Joseph Gregori High School

Madera County Jail  Expansion

Scope of Project: HVAC / Architectural Metal / Custom Fabricated Sheet Metal


El Capitan High School was a 185,000 sq ft new school campus in Merced CA. The school consists of 10 buildings, including a gymnasium, cafeteria, administration building, 2-story classroom wings with a total of 81 classrooms.

 

Scope of Project: HVAC / Sheet Metal


Joseph Gregori High School is a 14 building, multi-level facility on 88 acres in Modesto, CA. The school exceeds Title 24 requirements by 17%. This was accomplished through implementation of innovative heating and cooling systems.

 

Modern Air can provide new equipment, service, maintenance and repair for residential, commercial and industrial customers. Please give us a call!

ElCap.jpg GregoriHS.jpg MaderaJail.jpg

Scope of Project: HVAC / Sheet Metal


Madera County Jail expansion consisted of four buildings, including a single level 12,271 sq ft Visitation Building, a single level 3,109 sq ft addition to the existing building, a two-level 27,141 sq ft Housing Building, and a 2,400 sq ft Central Plant.


 

VWRDistribution.jpgSaladCosmo-1.jpgUCMercedHousing.jpg

VWR Distribution Facility

Salad Cosmo

UC Merced Housing: The Summits

Scope of Project: HVAC / Custom Fabricated Sheet Metal


VWR Distribution facility in Visalia CA is a 500,438 sq. ft. warehouse/distribution center for laboratory supplies for pharmaceutical and biotech companies, as well as industrial, educational, and governmental organizations. Do to the extremely large building foot print, most equipment was set by helicopter.

Scope of Project: HVAC  / Custom Metal Fabrications


The Salad Cosmo plant in Dixon CA is an environmentally friendly producer of various sprouts that it ships to grocers all over the west coast. The ten large “Grow Rooms” created ductwork configuration challenges during the project's aggressive schedule. Modern Air worked closely with the other contractors to complete the project on time and on budget.


 

Scope of Project: Architectural/Custom Sheet Metal / Metal Roof / Metal Wall Panels 


The Summits is a 109,878 square foot, 5-story dormitory on the UC Merced campus that houses approximately four-hundred students in a mixture of single, double, and triple occupancy rooms.  Modern Air also installed the trash chute system, a first for us!


 

Here are just a few of our completed projects!

Modern_Air_Logo_gold.jpg